Press Coverage

The Evolution of BIM Use for Bridges and Tunnels

Issue link: https://geospatial.trimble.com/en/resources/i/1415426

Contents of this Issue

Navigation

Page 36 of 47

MAY 2019 csengineermag.com 37 Project As part of a coordinated development plan, Zhong-Guan-Cun will integrate the resources of Beijing, Tianjin, and Zhong-Guan-Cun to build a science and technology city. The CNY 2.2 billion project includes the design and construc- tion of roads, utility pipelines, a 174,000-square-meter park, and green roadsides spanning 477,000 square meters. As the overall project consultant, CCCC Water Transportation Consultants Co., Ltd. (CCCC) needed to develop an innova- tive city model. Solution The team used the integrated BIM capabilities of Bentley's OpenRoads and OpenBridge Modeler with ContextCapture to generate a comprehensive 3D model of the entire city. The team collected terrain data via unmanned aerial vehicles to integrate into ContextCapture, generating the reality mesh. Given the large geographic span, wide construction area, and tight construction timeline, CCCC's project team also implemented a collaborative BIM process. The team used Bentley's Connected Data Environment to coordinate with the many engineering disciplines and seamlessly deliver the new digital city. Outcome The 3D model of the city helped CCCC identify and remedy more than 200 collision points, optimizing design and reducing costly rework. The model also allowed the project team to perform construction simulation, facilitating con- struction management. The simulation streamlined the construction process, shortening it by 64 days to save CNY 6.6 million in costs. Using ContextCapture to generate the reality mesh also facilitated earthworks planning and saved approximately CNY 40 million. Software ContextCapture was used to create the 3D model of the new science and technology city. LumenRT and Naviga- tor helped further visualize the model and conduct analyses. OpenRoads helped complete the creation of the road engineering model while OpenBridge Modeler helped create the bridge and culvert engineering models. Bentley's Connected Data Environment based on ProjectWise streamlined workflows and improved design efficiency. CCCC Water Transportation Consultants Co., Ltd. BIM Technology Application in the Municipal Infrastructure Phase I of Zhong-Guan-Cun Science and Technology Town

Articles in this issue

Links on this page

view archives of Press Coverage - The Evolution of BIM Use for Bridges and Tunnels