The SX12's green laser shines brightly in the
Maursund tunnel. On the walls are reinforcement
materials. The red discs with cross bars are the
bolts that hold the mats on and the steel grid is
for extra reinforcement. Concrete will then be
sprayed onto the the steel grid.
July/August 2021 / The American Surveyor
19