Skip to content

Using Trimble tunneling solutions for Switzerland's largest tunnel project

Discover how Pini Group utilizes Trimble® total stations, laser scanners and Trimble Access software to monitor construction on the Gotthard Road Tunnel project.

The Trimble Access Monitoring module is particularly useful as it is robust, user-friendly and helps us save time on the project, particularly for automating the convergence monitoring.
— Carlo Bergamaschi
Project Leader, Pini Group

Background

Expanding Swiss N-S link

Constructed below the St. Gotthard Pass in the Swiss Alps, the Gotthard Road Tunnel spans 16.9 kilometers (10.5 miles) between the Italian and German sides of Switzerland. The 10-year construction of the tunnel was completed in 1980, and it has since endured the wear and tear expected for a well-traveled route. Because a full closure of the existing roadway for maintenance is unacceptable for this critical north-south route, the Swiss Federal Roads Office FEDRO initiated plans to build a second parallel tunnel—the largest tunnel construction project currently underway in Switzerland.

To prepare for this major expansion, engineering and consulting firm Pini Group partnered with Matteo Muttoni Costruzioni SA to build and monitor the expansion of the Gotthard’s SiSto Sud security tunnel. The SiSto Sud provides an emergency outlet from the existing roadway in the event of accidents. Once completed, construction will begin on the main parallel tunnel. Having recently joined Pini Group from Trimble Italia, Carlo Bergamaschi introduced new Trimble monitoring hardware and software to the team.


Solution

Advanced monitoring tech

Supported by local Trimble distribution partner Spektra Srl, Pini Group adopted an array of Trimble instruments and field software to meet the demanding requirements of underground construction. The technology used includes the Trimble SX12, S5 and S7 total stations, the X7 laser scanner, TSC7 controllers and TDC600 handheld receivers, as well as Trimble Access and Trimble Business Center software.

Carlo Bergamaschi and senior surveyors Gabriele Biraghie and Giacomo Longhi deploy these tools to monitor the walls around the tunnel blasting and excavation areas and collect convergence measurements inside the tunnel as construction progresses. The team also conducts construction stakeout inside and outside the tunnel, including the precise positioning of steel arch ribbing. Using the Trimble SX12 scanning total station, surveyors perform tunnel verification and excavation control to conduct accurate overcut and undercut analysis.


Results

Underground efficiency

The adoption of Trimble hardware and software has significantly streamlined operations for Pini Group. The Trimble Access Monitoring module saves critical project time by automating convergence monitoring processes.

The intuitive interface of Trimble Access ensures a minimal learning curve, allowing team members to quickly access key data and analysis whenever needed. The durability and resilience of Trimble instruments helps the team address complex site challenges, such as maintaining required minimum distances between the main Gotthard Road Tunnel and the security tunnel, navigating tight spaces, adhering to short processing timelines, and tracking drift. Additionally, the centralized data collection facilitates concise communication across shift changes, ensuring continuity as work progresses toward upcoming SiSto monitoring projects in Switzerland.


Related Case Studies

undefined
Case Study

Mitigating solar cycle GNSS disruptions in mining operations

See how Trimble IonoGuard protects automated mining operations from solar-triggered GNSS signal disruptions.

Read full article
undefined
Case Study

Predicting landslides through continuous GNSS monitoring

Learn how University of Zagreb scientists use Trimble GNSS and T4D software to predict landslide movements in Croatia.

Read full article
undefined
Case Study

Case study: Managing risk for complex high-speed rail construction

Discover how Geo&Domus leverages Trimble automated total stations and T4D software to ensure safety along the A4 highway.

Read full article