Rail monitoring with T4D: Easier than ever

5 Minutes Read
|

Share this post:

Summary

Automate complex rail monitoring to increase project safety and efficiency with accurate track geometry analysis and real-time alerts using the Trimble® 4D Control™ (T4D) Rail module.

Trimble 4D Control (T4D) version 6.4 software introduces the first add-on module to the platform. The T4D Rail module offers a versatile rail monitoring solution that meets the industry’s demanding requirements for accuracy and efficiency.

Visit our T4D webpage to learn more, read our release notes and download here. For even more information, dig into the user guide and watch the T4D Rail webinar.

Railway construction with deep excavation, concrete retaining wall, train tracks, and workers in orange safety gear.

Image 1. An automated monitoring total station continuously measuring an active rail track while nearby construction takes place.

Rail monitoring overview

Rail monitoring is a critical component to ensuring safe and continuous rail traffic, and it has typically required a substantial amount of manual data collection and calculations. Often rail monitoring is an activity that plays a critical role in the support of rail line operator safety during construction projects on or close to existing railroad tracks. Frequent rail monitoring can also help identify track changes caused by activities such as tectonic movement, heat waves and other environmental conditions.

Conventional methods used for rail monitoring are time-consuming — requiring multiple surveyors to manually collect each point along the rails — and often cause disruption to traffic flow and pose a potential risk to workers. In addition, complex calculations for large amounts of data are typically managed manually, impacting efficiency. Trimble’s purpose-built T4D Rail module presents a streamlined total station-based rail monitoring workflow.

Florian von Matt, a Trimble Monitoring customer and geomatics engineer at Wild Ingenieure AG in Switzerland said, “This unique solution provides a comprehensive perspective and a great opportunity to standardize rail monitoring data and deliverables. The T4D Rail module is simple to understand and will make work much easier for stakeholders that need to interpret and prepare data for analysis.”

Informed by current rail authority standards, the module allows professionals to meet comprehensive deliverable criteria. The automated process reduces field time, repeat site visits, rail traffic disruptions and improves worker safety. Along with this, the software module provides real-time alarming for early awareness of critical impacts to support informed decision-making. This module allows more professionals to adopt rail monitoring as part of their business and for the work to be completed efficiently while meeting rail project standards.

The rail monitoring basics

With rail monitoring, it is not enough to know that prisms have moved. The movement of prisms along both sides of the track needs to be considered together and related to the actual rail track position. These components are essential to determine if the track itself has moved and what that movement means for rail transportation safety. Before users can monitor the track’s movement accurately, the initial track position and shape — also known as rail track geometry — need to be determined.

A rail as-built survey captures the original state of an existing track and is used to relate any detected movement of permanently installed prisms to changes in the rail track geometry. These changes will be quantified by several rail track parameters, such as cant, twist, versines and displacements.

A surveying prism on a rusty railroad tie, surrounded by gravel ballast next to a railway track.

Image 2: Prism affixed to a rail sleeper for continuous monitoring. Epoxy or a mounted bracket is a common method of attaching prisms to rail tracks.

Create & integrate accurate rail as-builts with ease

For rail monitoring results to provide support for informed decision-making and safety, a rail as-built survey needs to be very accurate. When using installed prisms, the vertical and horizontal offsets from each prism center to the top of the rail need to be precisely measured and recorded. Due to the significant amount of effort required for this process, many professionals simply measure the offsets of a couple of prisms and apply the same offsets for the rest. The prisms are then installed as similar to each other as possible, so their blanket offset assumption is not too far off. Moreover, each chainage — a prism pair on each side of the track — needs to be noted and manually configured.

Rack railway track with a central toothed rack and two running rails. Two small black sensors are mounted on the sleepers.

Image 3. Example of a common paired prism installation where they are installed on the same sleeper to measure rail geometry parameters such as cant.

The new T4D Rail module simplifies this process and makes it possible to take advantage of a connected Trimble ecosystem, making fieldwork more efficient and more accurate. Users can leverage alternative rail as-built survey methods — the Trimble GEDO system or with the track measuring bar (also known as the track gauge bar) paired with the Trimble Access™ Track Gauge Survey app — that are simple and sophisticated. T4D Rail seamlessly integrates with these as-built methods, to create a comprehensive monitoring system.

When using one of these Trimble as-built survey methods, the resulting .track file, combined with the coordinates of permanently installed prisms, automatically creates a virtual representation of a railway section in the T4D Rail module. With this process, every chainage and every prism offset are automatically calculated, and users can review what has been auto-detected before starting the monitoring process. This saves time in the field and office and delivers a more accurate depiction of the track geometry than traditional methods.

Automated analysis and visualization

Errors in rail monitoring can lead to misunderstanding of potential risks, so accuracy and reliability are crucial elements of any monitoring system. Instead of conducting time-intensive manual calculations that are susceptible to mistakes, the T4D Rail module automates calculations for all track geometry parameters, generates analysis charts and triggers alarms. What would usually take a few days in the office can now be completed in an hour or so, cutting out up to 95% of office work.

Yellow Trimble GEDO CE rail measurement device on railway tracks next to a train station platform.

Image 5. A demonstration of using the GEDO system to measure the as-built track geometry before starting a monitoring campaign.

Trimble 4D Control graph shows vertical displacement over time for multiple points, with colored alert zones and a data tooltip.

Image 6. Vertical displacement chart in T4D showing track settlement over time for nine specified chainages.

Line graph in Trimble 4D Control showing vertical displacement (mm) vs. chainage (m) for multiple times on 29/10/2022.

Image 7. Vertical displacement chart in T4D showing track settlement along the rail’s chainages for five specified epochs.

There are two different ways to visualize the data for all automatically calculated rail track geometry parameters on a chart: across epochs or across chainages. When visualizing across epochs, you can quickly notice at which points in time unwanted movement began. When visualizing against chainages, it helps to signal which sections of the track are concerning. Both chart types have colored rectangular bands to represent the attention (blue), warning (yellow) and alarm (red) thresholds.

“The automatic visualization of the configured thresholds in the chart views is just great,” said von Matt. At a glance, the severity of any detected movement can be distinguished. Another benefit of the T4D Rail module is the ability to export data into Excel. An organized spreadsheet can be exported with all the required rail track geometry parameters specified by many rail authorities.

Chainage Data Report: Reference (2021-07-08) vs. Current (2022-01-24) measurements in Excel, including elevation, displacement, and versine.

Image 8.  Example Excel export from the T4D Rail module with rail monitoring parameters related to chainage/station along the rail track. The blue cell color indicates that the value has passed the attention threshold and the yellow cell color indicates that the value has passed the warning threshold.

Excel spreadsheet with Vertical Versine (mm) data. Rows are Chainage (m), columns are dates (July-Sep 2021). Numerical data with highlights.

Image 9.  Example of the multi-tabbed Excel export from the T4D Rail module with vertical versine parameter in millimeters related to chainage/station in meters along the rail track across time.

Flexible monitoring and expanded business opportunities

By reducing manual work and personnel costs, one of the biggest expenses companies have today is greatly reduced, especially when considering the skilled labor shortage in the industry. Whether you are collecting monthly manual measurements or automatically every few minutes, the T4D Rail module will support companies' preferred monitoring schedule. Additional flexibility is delivered through several customizable as-built survey options, charting types, and threshold and alarm settings.

The T4D Rail module expands business opportunities by reducing crew field time and simplifying calculations, which minimizes the learning curve that goes along with sophisticated rail monitoring processes. By automating and streamlining the process, resources can be better utilized on high-impact projects and other business opportunities.

Mountain railway tracks, power lines, and a sensor on a pole, overlooking a valley with a lake and distant peaks.

Image 10. A picturesque scene in Switzerland of an automated monitoring total station perched up over the rail tracks with green hills and mountains in the background.

Availability

To add the rail module to your T4D software platform, contact the Trimble Monitoring team here or reach out to your local Trimble distribution partner.

Panoramic view of a train station platform, with two curving tracks, a construction site, and an orange-suited worker.

Image 11. A panoramic photo of a section of rail track that is being monitored by a passenger station area.

Related Articles

From chaos to consistency: 4 ways to build data consistency with connected workflows
article

From chaos to consistency: 4 ways to build data consistency with connected workflows

$1.8 trillion is lost annually to bad data from manual transfer (USBs and email). A single, connecte...
Read full article
3D laser scanning: New opportunities for surveying and mapping professionals
article

3D laser scanning: New opportunities for surveying and mapping professionals

By collecting dense point clouds and color imagery in a fraction of the time, 3D laser scanning tech...
Read full article
How to georeference your scanning project in Trimble Business Center
article

How to georeference your scanning project in Trimble Business Center

Quickly georeference a laser scanning project using known points like targets and point IDs....
Read full article